Menu
Log in
Log in


News

Only VVCC Members can comment on News posts. Not a Member and want to comment? Please join the VVCC by clicking here

  • 20 Dec 2015 7:45 AM | Kevin Adams (Administrator)

    Hi All and Happy Holidays – 

    We hope your New Years Resolution is to help the trails more!!! Here are dates for the Saturday trail days into March.

    January 9th 

    January 23rd 

    February 6th 

    February 20th 

    March 5th

    WHERE: 

    Schuerman Mountain TH at 8:30 am. The trail work will consist of new trail construction and general maintenance in the Carrol Canyon/Scheurman Mountain area. All trail work sessions start at 8:30 am and conclude at 1:00 pm unless otherwise noted. 

    Directions: From Sedona head west on 89A (towards Cottonwood), turn left on Upper Red Rock Loop Road. Continue on Upper Red Rock Loop Road for .25 mile and take a right onto Red Rock High School Drive. The Scheurman Mountain Trailhead will be on the left. 

    What to bring: 

    • Sturdy closed-toe shoes
    • Long pants
    • Sunscreen, water and snacks
    • Gloves
    • Bike helmet or hard hat (if available)

    For more information please call or email: 

    Forrest Saville, Trail Coordinator (928) 606-1748

  • 8 Oct 2015 7:43 AM | Kevin Adams (Administrator)

    Sedona City Engineering has approved the recently finished 100% planning documents from IMBA Trail Solutions and Stantec Engineering. The city has now opened a request for Statement Of Qualifications (SOQ) on their website for a BSP contractor. If you or anyone you know is interested in applying for the contract follow the bellow link. Huge thanks to all who participated in the BSP task force at the city and especially to Doug Copp the City Bike Cordinator/VVCC board member for keeping the ball rolling on this amazing project. 

    Get STOKED!!!!! 

    http://sedonaaz.gov/Sedonacms/index.aspx?recordid=205&page=663



  • 7 Oct 2015 7:41 AM | Kevin Adams (Administrator)

    YOU ARE INVITED TO JOIN THE FALL 2015 REDROCK VOLUNTEER TRAIL WORK DAYS

    October 24

    November 7 & 21

    December 5 & 19

    All trail work days will start out by meeting at the Old Post Trailhead at 8:30 am. This trailhead is located at the south end of the Old Post Trail, at the Kiosk located by the paved Chavez Ranch Road. The trail work will consist of new trail construction and general maintenance in the Carrol Canyon/Scheurman Mountain area.

    Directions: From Sedona  head west on 89A (towards Cottonwood), turn left on Upper Red Rock Loop Road. Continue on Upper Red Rock Loop Road for 1.8 miles and take a left onto Chavez Ranch Road. The Old Post Trailhead will be on the left.

    All trail work sessions start at 8:30 am and conclude at 1:00 pm unless otherwise noted.

    What you need to bring: Sturdy closed-toe shoes, long pants, sunscreen, water, snacks, and head protection are required. If you have a bike helmet or hard hat, you can bring that. Hardhats and gloves will be provided for those who do not have them. Trail tools and trail work instructions will be provided. Children under 18 must be accompanied by a parent/guardian. Please put these dates in your calendar and bring your friends and family!There is lots to do, of varying degrees of skill and effort.

    For more information please give a call to or email Forrest Saville, Red Rock Ranger District Trail Coordinator.

    Forrest Saville

    p: 928-203-7509 

    c: 928-606-1748 

    f: 928-203-7539 

    sfsaville@fs.fed.us


  • 26 Jun 2015 7:05 AM | Kevin Adams (Administrator)

    Are you curious about Keep Sedona Beautiful's pursuit of getting Sedona and a good portion of the Verde Valley designated as a National Monument? So are we. A big thanks to Board Member Dan Blaetter for volunteering to sit on KSBs executive committee where the details of the movement will be discussed and developed. Dan hopes to ensure we cyclists are represented and we do not lose any access or rights.

    If you are curious to find out more on the movement here is a link to a website put up by KSB for more info: www.sedonaverdevalleyredrocknationalmonument.org

    We also encourage people to look into this themselves. There are a 9 other monuments managed by the National Forest with in the US. Please share your thoughts through the comments or email us at: board@vvcc.us

    https://en.wikipedia.org/wiki/Category:United_States_Forest_Service_National_Monuments

  • 26 Jun 2015 7:04 AM | Kevin Adams (Administrator)

    A big thanks to Board members Doug Copp, Dan Blaetter, Jake Plapp and Caroline Oreel and many other community and city members for making this possible!!! The VVCC hopes to see this progression of bike friendly infrastructure continue to grow. Here below is Sedona's report card alongside the average rating of a Gold community.


  • 13 Apr 2015 7:02 AM | Kevin Adams (Administrator)

    If you're planning on helping out with the Sedona Bike Park there will be a training coming up in Flagstaff this Saturday the 18th for the Fort Tuthill Bike Park through Flagstaff Biking Organization. We highly recommend you attend this if you plan on helping out with construction or maintenance opportunities with the Sedona park. VVCC is supporting this training and hope you can attend. Follow the link below for full info.

    http://flagstaffbiking.org/fort-tuthill-bike-park-training-presented-by-imba-trail-solutions/ 


  • 10 Mar 2015 7:01 AM | Kevin Adams (Administrator)

    Due to scheduling conflicts with FS and VVCC trail leaders being unavailable now for Wednesday's trail work we have to cancel. Sorry

  • 14 Feb 2015 6:59 AM | Kevin Adams (Administrator)

    The Red Rock Ranger District and the Verde Valley Cyclist Coalition will be hosting volunteer trail work days starting in Feburary through April. Work days are open to anyone interested in light to heavy trail work on trails located throughout the Sedona Area. See the schedule below for dates/times and meeting locations. Volunteers should come prepared with a helmet if available, eye protection, work gloves, drinking water, sun screen, a hat, long sleeved shirt, long pants, and wear boots with ankle support. All tools provided by USFS.


    For more information please call Forrest Saville at 928-203-7509 or email atsfsaville@fs.fed.us

    It will be every other Wednesday and the 3rd Saturday of every month MEETING AT 9am.

    Feb 21 – Canyon of Fools (Finish Wash) --- Meet at OK/Dawa TH

    Feb 25 - Canyon of Fools (Tread Work/Rehab/Drains) --- Meet at OK/Dawa TH

    Mar 11 – Hiline (Reroute) --- Meet at Baldwin TH

    Mar 21 – Hiline (Armor/Paint/Brush) --- Meet at Baldwin TH

    Mar 25 – Templeton (Reroute/Brushing/Drainage) --- Meet at Courthouse TH

    Apr 8 – Llama (Reroute/Brushing/Drainage) --- Meet at Courthouse TH

    Apr 18 – Hogs (Tread work/Armor fix/Brushing) --- Meet at Broken Arrow TH

    Apr 22 - Pigtail (Armoring) --- Meet at Broke Arrow TH

  • 13 Jan 2015 6:58 AM | Kevin Adams (Administrator)





The VVCC is a 501(c)(3) non-profit founded in 2003 (incorporated in March 2004) to promote road and mountain bike advocacy in, and around, the Verde Valley of Northern Arizona.


CONTACT US

Email: board@vvcc.us

  

Powered by Wild Apricot Membership Software